home page

not badMobile boarding bridge Mobile boarding bridgeThe risk of price fluctuations

2024-05-09 00:16:07release

Ensure that power cables and electrical circuits are not damagedPlease refer to the instruction manual for the maintenance and maintenance of the elevator to check the braking torque of the brakenot bad,The vibration frequency should be set to obtain large dynamic stress with low energy consumption and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components,not badSelf folding arm lifting platform, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from , and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at r/min, so r/min was determined as the aging frequency.After cleaning, clean the filter and replace it with a new filter element before adding new oil. What adverse reactions may occur during the early use of hydraulic cargo elevators?Pontian Kecil,The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack,not badSelf propelled mast lifting platform, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.When disassembling the hydraulic oil tank filler cap, filter cover, inspection hole, hydraulic oil pipe and other parts, it is necessary to avoid dust during the system oil passage. The disassembled parts must be thoroughly cleaned before opening. When disassembling the hydraulic oil tank filler cap, first remove the soil around the tank cap. After loosening the tank cap, remove any remaining debris from the joint area (do not rinse with water to prevent water from seeping into the tank). Only after confirming cleanliness can the tank cap be opened. When using materials and hammers, materials that do not remove fiber impurities and specialized hammers with rubber attached to the surface should be selected. Hydraulic components and hydraulic hoses should be carefully cleaned, dried with high-pressure air, and then assembled. Choose a well packaged filter element (the inner packaging is damaged, although the filter element is intact, it may also be unclean). When changing the oil, clean the filter at the same time. Before installing the filter element, carefully clean the bottom dirt inside the filter housing with materials.Check the interlocking equipment, up and down travel, it is necessary to adjust or replace it. If the elevator bearing is worn, replace the guide wheel or bearingThe arrangement of vibration points should be based on the vibration aging process standard GB/T-. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.Regularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression)average method, restaurants, and restaurants. The low height is between -mm, especially suitable for workplaces that cannot excavate pits. And there is no need for upper lifting points, with diverse forms (single column,not badMobile lifting platform, double column four column), simple and reliable operation stable equipment operation, economic and convenient goods transmission, and difficult to solve narrow spaces that cannot reach the requirements. A customized delivery platform can be created, and the product hydraulic system is equipped with anti fall, upper and lower door interaction, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point. The product has a sturdy structure a large load-bearing capacity, smooth lifting, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The lifting stage device is mainly responsible for data processing of the operation mechanism and work bar of the vehicle, calculating the safety area of the lifting stage, and is suitable for the electric control system of the self lifting stage lifting platform. The main sensors in the electric control system include angle sensors, long angle sensors, dual axis inclination sensors, and energy saving of the oil cylinder system.Drop test to check if the braking interval of the safety governor meets the requirements of the rules. Equipment transfer maintenance: Check the coupling between the electric motor and the worm gear reducer, and dismantle the gearbox. Clean all components and seals replace excessively worn and deformed parts and smooth oilCheck and repair the electrical circuit and control panel switch components. If there is aging in the circuit, replace it


not badMobile boarding bridge Mobile boarding bridgeThe risk of price fluctuations



Check all standard sections and diagonal support connection points. Check the fastening bolts of the gear rack and ensure that the motor cooling wing plate and organization are cleanreform,Check and clean the driving gears and guide wheels of the elevator. If there is excessive wear, it is necessary to replace themThe arrangement of vibration points should be based on the vibration aging process standard GB/T-. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.Organize, remove rust and repaint the structural components such as the suspension cage and guide rail frame for corrosion, and reinforce the severely corroded load-bearing membersnot bad,How to maintain and maintain the stage? When using the lifting stage in daily life, Jinan Dasheng Hydraulic Machinery will introduce several maintenance and attention points for everyone: the brakes of each mechanism should be regularly inspected and adjusted for the clearance between the brake pads and wheels to ensure flexibility and reliability. On the friction surface, there should be no dirt present, and any dirt must be washed off with gasoline or thinner. Pay attention to checking each steel wire rope for broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. Professional elevator manufacturers have a complete range of products, which are popular both domestically and internationally. Our equipment has a long service life! The industry leader in product wire products, welcome to inquireRegarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracketOn the contrary, it should be adjusted in the opposite direction; When the meshing backlash of the gear pair is greater than .mm, adjust the tooth back pressure wheel to press towards the back plane of the gear rack until the backlash reaches a reasonable range. Otherwise, it should be adjusted in the opposite direction. At this point, the guide roller should be loosened for o and then adjusted according to the adjustment of the guide roller.


label:
4answers
Mechanical and
2floor-- · 2024-05-09 07:31:44

Brother, with your support, this new model not badMobile boarding bridge Mobile boarding bridge is indeed up to standard and very good.

See more
Import and expo
3floor-- · 2024-05-09 07:39:03

Just bought not badMobile boarding bridge Mobile boarding bridge, the quality workmanship is even worse. Look back and introduce to friends

See more
Tengxiang Sheng
4floor-- · 2024-05-09 07:52:01

not badMobile boarding bridge Mobile boarding bridge The quality at this price is excellent value for money

See more
quasi-customer
5floor-- · 2024-05-09 09:07:46

My colleagues like it very much. Come again next time. It's a rare genuine product. not badMobile boarding bridge Mobile boarding bridge I'm very satisfied with it. The boss has a good personality, awesome. Not bad. The quality is good. The speed is also fast. Really good!

See more
Sign in Post answer
Related issues
view all
Collectors(1)